Roofing Services in Clyde, KS
From quick fixes to major projects, Clyde Roofing & Maintenance has been the roofing contractor Clyde homeowners call for 14 years. Here's a rundown of what we offer.
Roof Replacement
The average roof replacement in Clyde takes one day for a standard residential home. Larger or steeper roofs might take two. Either way, we don't leave a house uncovered overnight. If we tear it off, we cover it before we leave. No exceptions.
Get a Free Quote →Roof Repair
Our roof repair process: inspect the issue, identify the root cause, quote the fix, do the work, warranty the repair. Simple. If the root cause is widespread (poor ventilation causes ice dams, for example), we'll recommend addressing that too. But the choice is always yours.
Get a Free Quote →Storm Damage Repair
We handle storm damage claims from start to finish: inspection, documentation, claim filing, adjuster meeting, supplement if needed, repair or replacement, and final inspection. Our supplement team has recovered thousands in additional coverage for Clyde homeowners that adjusters initially missed.
Get a Free Quote →New Roof Installation
We install new roofs on new homes, additions, detached garages, carports, and covered patios. Material options include asphalt architectural shingles, metal standing seam, metal corrugated, and flat membrane systems. We help you choose based on your budget, aesthetic preference, and the specific demands of your Clyde climate.
Get a Free Quote →Metal Roofing
We install 24-gauge and 26-gauge steel standing seam panels in Galvalume and pre-painted finishes. Concealed fastener clips allow the panels to expand and contract with temperature changes without stress on the fasteners. That's why standing seam doesn't leak. The clips float.
Get a Free Quote →Shingle Roofing
GAF Timberline HDZ. The best-selling shingle in North America. With StrikeZone nailing area for consistent fastener placement. Class A fire rating per UL 790, Class 4 impact resistance per UL 2218 (when installed in the GAF Roof System), and Class H wind rating per ASTM D7158 (130 mph). We install Timberline in the full GAF system to qualify for Golden Pledge warranty: 25-year non-prorated workmanship plus 50-year materials with WindProven limited wind warranty (no max speed). That warranty is why we recommend GAF for most Clyde homes.
Get a Free Quote →Flat Roofing
The number one cause of flat roof failure is ponding water. Standing water that doesn't drain within 48 hours after rain. We solve ponding by installing tapered insulation systems that create positive slope to drains, scuppers, or roof edges. Minimum 1/4" per foot of slope eliminates standing water.
Get a Free Quote →Commercial Roofing
We install Carlisle SynTec and Firestone TPO membrane systems in 60-mil and 80-mil thickness over minimum R-25 polyiso insulation (more in climate zones requiring it). Seams hot-air welded at 900°F+ and tested with a seam probe. Fully adhered systems for wind uplift zones per FM I-90 or I-120. Mechanically attached for re-roofs over existing insulation. NRCA member, trained per manufacturer specifications.
Get a Free Quote →Gutter Installation
Seamless aluminum in 5" K-style is the standard for Clyde residential. We use 6" K-style on larger homes, steeper pitches, or roof areas with high water volume. Downspouts are 2x3" on 5" gutters and 3x4" on 6" gutters. Matched to handle the flow.
Get a Free Quote →Roof Inspection
Our inspection covers the roof and the attic. From the attic, we check for daylight through the roof deck, moisture stains on rafters, mold on sheathing, and ventilation function. Problems in the attic often indicate roof issues that aren't visible from the surface.
Get a Free Quote →Emergency Roof Repair
When a tree goes through your roof at 2 AM, you need someone who answers the phone and shows up with a truck full of materials. Call (877) 349-1553. We handle roofing emergencies in Clyde 7 days a week, including holidays.
Get a Free Quote →Skylight Installation
VELUX FS (fixed) and VS (vented) skylights installed with EDL flashing kits for shingle roofs. The multi-step flashing integrates with the surrounding shingle courses per IRC R903.2. We frame the curb with doubled 2x8 or 2x10 lumber (depending on rafter depth), install ice and water shield membrane around the entire curb perimeter, then set the skylight with factory sealant before weaving step flashing into the field. Top headwall flashing tucks under the upslope shingle course. Bottom sill pan diverts water onto the downslope shingles. Zero exposed sealant joints. Mechanical flashing only.
Get a Free Quote →